Electrical Construction
Break ground on your next electrical construction project with a team that specializes in commercial, industrial, healthcare, data centers, and other mission-critical environments. Our experts focus on pre-construction, advanced planning, and meticulous execution to keep your project on time, on budget, and risk-free.

Ground-Up Electrical Construction
Execute with certainty, avoid surprises, and mitigate risks.
For ground-up electrical construction projects, predictability is everything. With decades of experience in the field, we’ve serviced numerous greenfield projects, fine-tuning our processes to guide your project from design to execution, free of worry or delay.
During the pre-construction phase of the project, we conduct scheduling, sequencing, and cross-collaboration to ensure resources are accounted for and time allotted. During the planning and execution phase, we’ll focus on quality, production, and safety to keep your project on time, on schedule, and avoid unnecessary risk.

Retrofitting & Upgrades
Scale your renovation with the level of support that's right for you.
For renovation or retrofitting electrical construction services, we understand your need to work with a contractor who can remain agile; as the project progresses, your requirements also evolve. We take a holistic approach from start to finish on renovation projects and have the capability to take on various roles, leading complex build-outs or supporting as a specialized electrical subcontractor.
We customize each project to deliver you a functionally sound and tailor-made solution. Our construction service projects focus on highly scalable and flexible builds, offered at a higher value than our competitors.
Our in-house engineering services ensure compliance, technical accuracy, and optimized designs. Explore our impact on electrical construction projects of all sizes.

Samsung Semiconductor Fab Plant
Delivering critical electrical infrastructure—including three prefabricated modular buildings—for Samsung’s new $17 billion semiconductor campus in Taylor, Texas.
.jpg?width=1180&name=Ext.%20Drone%20(6).jpg)
Methodist Celina Medical Center
Cummings delivered full electrical construction for a new 192,000 SF hospital, CUP, and office building, ensuring scalable infrastructure across the 30-acre master-planned Methodist Celina campus.

Omni PGA Frisco Resort & Spa
This large-scale resort features a 500-key hotel, PGA golf facilities, luxury villas, retail, and event spaces across a 660-acre site. Cummings delivered full electrical construction to power the resort’s hospitality, recreational, and tournament-ready infrastructure.

Medical City Dallas Upgrades
Replaced an outdated 8MW plant with a fully automated 24MW, 13.2kV central utility system at Medical City Dallas—all without disrupting critical hospital operations. The phased install included dual 12MW feeds, advanced switchgear, and six 15kV substations to ensure long-term reliability and scalability.

THR Jane & John Justin Tower
The 11-story, 400,000 SF Justin Tower added patient rooms, ORs, and a connector to Richardson Tower—engineered to support four more future floors.

MDN 1A&2A (Confidential Data Center)
This 60MW data center leveraged a semi-modular electrical design to streamline installation, featuring 48 distribution skids and generators supported by Main-Tie-Main switchgear and UPS systems. Cummings coordinated over 30 subcontractors and 130+ MOPs, managing critical infrastructure and commissioning through Level 5—all while overcoming pandemic-related challenges to deliver on schedule.

UTSW Clements University Hospital
Supported a major expansion and renovation of UTSW Clements University Hospital, including a 12-story patient tower, two parking garages, and critical infrastructure upgrades—all while maintaining full hospital operations.

Confidential Financial Data Center
This $125M data center project included MTM switchgear, 10 generators, 6 UPS systems, and prefabricated components to reduce labor costs and improve efficiency. Systems converted 15kV to 480V/415V distribution, meeting strict reliability standards.

Project Ray
Completed full electrical scope for Project Ray, a 1 million-square-foot solar module manufacturing facility in Wilmer, Texas, built to support 5GW of annual production.
Samsung Semiconductor Fab Plant

Methodist Celina Medical Center
.jpg)
Project Snapshot
Omni PGA Frisco Resort & Spa

Project Snapshot
Medical City Dallas Upgrades

Project Snapshot
THR Jane & John Justin Tower

Project Snapshot
MDN 1A&2A (Confidential Data Center)

Project Snapshot
UTSW Clements University Hospital

Confidential Financial Data Center

Project Snapshot
Project Ray
Fast-track delivery was supported by BIM coordination, prefabricated systems, and overhead busways, allowing rapid installation and field flexibility. The project was completed on time, meeting all safety and code standards, and now serves as a benchmark for large-scale renewable manufacturing in the U.S.



.jpg?width=300&height=230&name=Preconstruction%20Team%20(19).jpg)
The Role of Electrical Preconstruction in Today's Projects
Jerry Beighey, Vice President at Cummings Electrical, is committed to supporting an environment that conveys More Than a Job for his clients, peers, team, and the industry overall. Read his interview to learn more about Cummings' electrical expertise in pre-construction.
Read Full InterviewExplore our expansive electrical construction capabilities.
For your next project to be a success, you need experts who understand the complexities of your industry with the capacity to execute. Our dedicated construction services ensure manpower and resources are allocated to large-scale construction projects for measurable results, on time and on budget.
Pre-construction
Plan, design, and prepare for your next construction project, including design development, cost estimation, project timeline, and permits and approvals.
Prefabrication
Build, assemble, and transport manufactured building components to ease and accelerate the construction process.
Safety & Risk Assessment
Protect your workforce, assess ongoing risks, and maintain compliance with regulations throughout your work site.
Project Management
Ensure your project is completed on time, within budget, and according to the standards, including safety protocols, your team has set in place.
Quality Assurance & Quality Control
Prevent defects and delays throughout your project with process planning, training, documentation, and risk management.
Engineering
Streamline collaboration, efficiency, and accountability across your project from conception through completion.
Virtual Design & Construction
Our BIM team enhances project efficiency and collaboration through advanced 3D modeling, detailed documentation, and value-driven coordination that minimizes risks, rework, and costs.
Pre-construction

Feasibility Study
Together, we’ll evaluate the viability of your project based on factors like location, regulations, budget, and technical constraints. This includes site analysis, environmental assessments, and zoning requirements.
Budgeting and Cost Estimation
Our account team will provide you with a detailed breakdown of the expected costs, including materials, labor, equipment, and contingencies. This will help your team set up realistic financial expectations and secure funding.
Design Development
During the preconstruction process, design development includes drafting architectural designs and engineering plans. These may include preliminary sketches or detailed blueprints and technical drawings, depending on your project's complexity.
Scheduling and Timeline
We’ll then work out a construction schedule to outline the timeline, from start to completion. This includes key milestones, deadlines, and a sequence of tasks.
Permits and Approvals
Before construction can start, we’ll need to obtain all necessary permits and approvals. This ensures the project complies with building codes, environmental regulations, and zoning laws.
Risk Assessment and Mitigation
Identifying potential risks (financial, environmental, logistical, etc.) early on helps develop mitigation strategies to reduce the likelihood of delays or cost overruns during construction.
Procurement and Resource Planning
The preconstruction phase outlines how materials, labor, and equipment will be sourced and managed. Early procurement planning ensures our team can access these critical resources when needed.
Discuss Your Project
Questions about breaking ground on your next build? Schedule a consultation with our team to learn more.
Prefabrication

Off-Site Manufacturing
Prefabricated elements are created in our factory setting, where the conditions are controlled for efficiency, precision, quality, and safety. This can include anything from project-specific components to larger, modular sections of a building.
On-Site Assembly
Once our team transports these prefabricated components to the construction site, they are assembled to form the complete structure. The site work is often limited to assembling these modules and connecting utility systems.
Modular Construction
On larger projects, prefabrication is often used in modular construction. Entire residential or commercial units, or even sections of buildings, are constructed off-site and assembled on-site like building blocks. Modular construction is especially common in high-rise buildings, hotels, and healthcare projects.
Prefabrication Synergy
Because our construction services teams have access to our Integrated Manufacturing Services (MFG), they're able to seamlessly streamline installation timelines and improve the overall quality of your project.
Discuss Your Project
Questions about breaking ground on your next build? Schedule a consultation with our team to learn more.
Safety & Risk Assessment

Workforce Wellness
Construction workers often face precarious conditions, including exposure to shock hazards, falling objects, hazardous materials, and operating in confined spaces. Cummings Electrical upholds safety protocols to protect lives and prevent serious injuries.
Compliance with Regulations
Governments and regulatory bodies, such as OSHA (Occupational Safety and Health Administration) in the U.S., establish strict safety standards for construction sites. We’ll help you maintain standards and avoid the fees, legal action, and project shutdowns that arise due to non-compliance.
Financial and Project Efficiency
Workplace accidents can delay projects, increase legal risks, and raise insurance costs. At Cummings Electrical, we’ve created effective safety measures to reduce costly interruptions and improve the overall efficiency of your project.
Discuss Your Project
Questions about breaking ground on your next build? Schedule a consultation with our team to learn more.
Project Management

Scope Management
We work to understand the scope of your project, including objectives, deliverables, and specific tasks that need to be accomplished. This helps us avoid scope creep, where additional tasks or features are added to the project without proper approval, leading to delays and cost overruns.
Time Management
We’ll create detailed schedules to track progress and ensure that each phase of your project is completed on time. This includes setting milestones, assigning deadlines, and identifying critical path tasks.
Resource Management
Our project leadership conducts thorough resource management assessments to ensure the availability of the required materials, labor, and equipment throughout the project. This involves coordinating subcontractors, managing the supply chain, and allocating resources effectively to avoid shortages or delays. On large projects, managing resources requires our project leadership to coordinate between different teams and phases of construction to ensure the most efficient use of labor and equipment.
Cost Management
Our teams will focus on budgeting and controlling expenses to ensure your project remains within its allocated budget. This includes estimating costs for materials, labor, equipment, and subcontractors, as well as ongoing monitoring of expenses during the project.
Risk Management
Construction projects are inherently risky due to their complexity, involvement of multiple stakeholders, and exposure to external factors like weather, material shortages, or regulatory changes. Our team manages risk by identifying potential risks early, assessing their impact, and developing mitigation strategies. Contingency plans, insurance, and safety protocols are commonly used to reduce the likelihood and severity of risks.
Contract Management
Contracts govern the relationship between our customers, contractors, subcontractors, and suppliers. We’ll define the scope of work, payment terms, and timelines to provide clarity and avoid project delays.
Service attribute
Fusce dapibus, tellus ac cursus commodo, tortor mauris condimentum nibh, ut fermentum massa justo sit amet risus. Vivamus sagittus lacus vel augue laoreet rutrum faucibus dolor auctor. Integer posuere erat a ante vananatis dapibus posuere velit aliquet.
Service attribute
Fusce dapibus, tellus ac cursus commodo, tortor mauris condimentum nibh, ut fermentum massa justo sit amet risus. Vivamus sagittus lacus vel augue laoreet rutrum faucibus dolor auctor. Integer posuere erat a ante vananatis dapibus posuere velit aliquet.
Service attribute
Fusce dapibus, tellus ac cursus commodo, tortor mauris condimentum nibh, ut fermentum massa justo sit amet risus. Vivamus sagittus lacus vel augue laoreet rutrum faucibus dolor auctor. Integer posuere erat a ante vananatis dapibus posuere velit aliquet.
Discuss Your Project
Questions about breaking ground on your next build? Schedule a consultation with our team to learn more.
Quality Assurance & Quality Control

Process Planning and Standard Setting
Establish quality standards based on the project’s requirements, building codes, and industry best practices. Develop a comprehensive plan for quality procedures, inspection schedules, documentation protocols, and personnel responsibilities.
Training and Competence
We ensure all workers, including subcontractors, and engineers, are adequately trained and qualified, which is key to maintaining high standards of quality.
Documentation and Auditing
During this phase of QA & QC, our teams create documentation to track quality-related processes. This may involve creating checklists, guidelines, and procedures for each phase of the project. Regular internal audits are conducted to ensure that these processes are followed correctly.
Inspection and Testing
We conduct regular inspections and tests throughout the construction process. Inspections occur at key milestones throughout a client’s project, often during and post-installation. Testing includes activities like evaluating the strength of materials, verifying electrical systems, or ensuring waterproofing is effective.
Risk Management QA
Our QA/QC team helps identify and mitigate potential risks before they become quality issues. For example, through comprehensive planning, QA can anticipate and address potential issues related to material procurement, weather impacts, or coordination among trades to avoid delays in construction.
Discuss Your Project
Questions about breaking ground on your next build? Schedule a consultation with our team to learn more.
Engineering

Design-Build
In this project delivery method, a single entity, known as the Design-Builder, is responsible for both the design and construction phases. At Cummings Electrical, we often serve as the prime electrical contractor and engineer-of-record with in-house design services, but this can also mean a partnership between an architect and our construction firm. Following this method, our customers have a single contract with the Design-Builder, simplifying communication and coordination.
Design-Assist
This is a hybrid approach where the design team (usually architects and engineers) work closely with the construction team (often specialized subcontractors or general contractors) early in the design phase. Unlike Design-Build, the two teams remain under separate contracts with the owner. In this case, our construction team provides input and assistance to the design team, ensuring the project is feasible and cost-effective from a constructability perspective.
Studies and Calculations
Our engineering team performs comprehensive power system studies—including coordination, arc flash, and short circuit analysis—using industry-standard software. These studies ensure your electrical systems are safe, reliable, and code-compliant from day one. We also provide temporary power system designs to support all phases of construction, ensuring scalable, safe, and efficient power delivery as your site evolves. To support field operations, we deliver detailed technical calculations such as voltage drop analysis, NEC code compliance, conduit pull tension, and duct bank thermal calculations. This precision engineering helps crews make informed decisions in the field, minimizes delays, and keeps projects running smoothly from design through installation.
Electrical Engineering Team
Our in-house team includes 13 engineers led by 5 licensed Professional Engineers (PEs), with licensure across most U.S. states and the ability to obtain others as needed. Several team members bring over 25 years of experience from diverse backgrounds—preconstruction, utilities, BIM, estimating, and field operations. This well-rounded expertise enables us to deliver practical, value-driven designs tailored to your budget and schedule. We understand equipment lead times, industry standards, and construction realities—so our designs are efficient, buildable, and aligned with your project goals. We collaborate closely with stakeholders to develop holistic solutions and offer constructability reviews that bring fresh insights and cost-saving innovations to your project.
Discuss Your Project
Questions about breaking ground on your next build? Schedule a consultation with our team to learn more.
Virtual Design & Construction

BIM Coordination
& Design
Our BIM team uses advanced 3D modeling to help you plan, design, and coordinate every detail of your project. This ensures seamless collaboration between disciplines, detects potential clashes early, and keeps your project moving efficiently.
Construction Documentation & Visualization
We provide you with detailed construction documents, parametric models, and visualizations that support efficient installation. These tools give you clear, accurate routing, precise shop drawings, and easy coordination with your field teams.
Value Engineering & Cost Optimization
Our BIM experts work closely with your project teams to analyze design alternatives, specify value-driven solutions, and integrate prefabrication details. This approach helps you optimize project costs, timelines, and overall constructability while reducing risks and uncertainties.
Improved Communication & Collaboration
Our team coordinates with all your project stakeholders, architects, engineers, and contractors to align every detail. This means fewer surprises, less rework, and smoother progress from start to finish.
Discuss Your Project
Questions about breaking ground on your next build? Schedule a consultation with our team to learn more.
Meet the professionals passionate about powering the future of transportation and well-equipped to help your projects thrive as an extension of your team.

Jerry leads the pre-construction, engineering, and estimating teams with a strong focus on precision, efficiency, and client satisfaction. With 27 years of experience, he fosters collaboration with clients and stakeholders from the initial concept through project completion.
- Holistic Approach: Focuses on design, constructability, scheduling, and problem-solving
- Proactive Methodology: Anticipates challenges to ensure smooth project execution
- Commitment to Excellence: Redefines standards in electrical contracting through expert planning and execution

- Established a UL-listed panel shop and expanded industrial automation capabilities
- Master electrician with over 15 years of trade experience
- Oversees industrial group with expertise in oil and gas, manufacturing, and complex infrastructure projects

Brad Samardzija brings 25 years of industry expertise and a people-first leadership style to his role as Vice President and Project Executive at Cummings Electrical. Known for building high-performing teams and trusted client relationships, Brad leads with humility, mentorship, and long-term vision.
- Executive leader with 25 years of electrical construction experience
- Focuses on team growth, project excellence, and mentorship-driven success
- Dedicated to building client trust and delivering projects that inspire pride

Chad Bell leads with clarity, fairness, and follow-through—bringing 26 years of electrical experience to his role as Project Executive at Cummings Electrical. His approach is rooted in trust, repeatable success, and strong client partnerships that stand the test of time.
- Project executive with 26 years in the electrical industry
- Known for common-sense leadership, client collaboration, and practical problem-solving
- Focused on accountability, quality delivery, and partnerships built to last

Louis Wyler is a trusted leader at Cummings Electrical, guiding complex electrical projects with precision, professionalism, and a relentless commitment to client satisfaction. He brings nearly two decades of hands-on experience to every partnership.
- Project executive with 19 years of electrical construction expertise
- Leads large-scale projects with a focus on accountability, quality, and team mentorship
- Dedicated to building trust, exceeding expectations, and driving long-term client success
.jpg?width=160&height=160&name=Shane%20Cranford%20(2).jpg)
Shane is a seasoned electrical engineering leader with over 25 years of experience, primarily at Cummings Electrical. His expertise, developed through a decade in consulting engineering, has enabled him to excel in high-stakes projects across various sectors.
- Leadership in Engineering: Oversees Design-Build, Design-Assist, and Power System Studies, emphasizing innovation and cost-effectiveness
- Collaboration Focus: Strong commitment to working with stakeholders to align with project visions and ensure optimal outcomes
- Strategic Leadership: Demonstrates how effective leadership in electrical engineering can blend innovation, efficiency, and collaboration
Get a glimpse of our step-by-step process throughout your project's lifecycle.
Meet with our team of industry specialists.
Since 2002, Cummings Electrical has outperformed other electrical and construction companies with dependability of service and quality of execution. We’re proud to lead every customer engagement with innovation and technical excellence. During the initial consultation, we’ll review your project specifications, site conditions, timeline, and budget so you can begin to make decisions based on project expectations, business operations, cost, and intended completion.
Integrate engineering and modeling processes.
Then, we’ll put pen to paper. During this phase of execution, we'll begin planning for the successful execution of the construction of your project. We'll begin to integrate engineering processes and conduct BIM/VDC modeling for accurate planning, and secure scheduling to ensure a seamless handoff to our procurement and execution teams.
Plan and procure materials according to your project requirements.
Next, we'll focus on securing the right materials for your project in alignment with your budget expectations. When beneficial, we'll use MFG prefabrication for critical assemblies. We’ll also pull in experts based on their expertise and experience, known as passion areas, to speed up the process with precision and mitigation of risk.
Execute with precision and comply with safety protocol.
After that, we’ll begin to coordinate with other trades and track progress against milestones. We’ll leverage years of industry expertise and a portfolio of complex commercial, residential, mixed-use, and industrial properties to inform our approach — all of this while maintaining strict adherence to quality assurance standards and safety protocol and regulations, including NEC, NFPA 70E, and local codes.
Conduct the project's closeout and commissioning process.
Once execution is complete, we'll carry out advanced closeout and commissioning protocol. Our teams work diligently to test systems thoroughly, provide documentation, and hand over a fully functional, code-compliant electrical infrastructure for long-term sustainability and client satisfaction.
Check out our greatest success stories.
.jpg?)
New Facility
Baylor Scott & White Irving Expansion
Irving

New Facility
Park District (PwC Tower)
Dallas

New Facility
AmeriTex- Gunter Plant
Gunter

New Facility
23 Springs Granite Cedar Park
Dallas
Baylor Scott & White Irving Expansion
Cummings partnered with Turner Construction to complete the new construction of a two-story Central Utility Plant as part of a major healthcare campus expansion. This facility was designed to support critical hospital operations with a robust electrical infrastructure. At the heart of the system is a 4,000A Main-Tie-Main switchgear, which is fed by twenty-four 4-inch conduits, each containing five 500MCM conductors—providing significant capacity and redundancy to ensure uninterrupted power distribution.
The plant’s emergency power system is supplied by four 1500kW, 4160V generators, all located on the second floor. These generators are configured to maintain essential hospital functions during utility outages, supporting life safety systems and other mission-critical operations. This installation required close coordination with other trades to maintain tight construction schedules and ensure system reliability. Following the successful completion of the Central Utility Plant, Cummings was invited back in 2018 to support the next phase of the project: a major addition and renovation to the existing hospital. This scope included a seven-story, 162,000-square-foot tower expansion. The new tower houses patient rooms, care support areas, and essential infrastructure enhancements to improve overall patient care and operational efficiency. As part of the renovation work, Cummings performed electrical upgrades to several specialized clinical areas, including cardiac catheterization labs, endoscopy and dialysis labs, and hybrid operating rooms. Additionally, we completed upgrades to the women’s health center, as well as enhancements to public-facing spaces such as the lobby and main entrance. Our team worked diligently in active hospital environments to ensure minimal disruption to ongoing patient care while maintaining the highest standards of quality and safety.
.jpg)
Project Snapshot
.jpg)
Park District (PwC Tower)

Project Snapshot
AmeriTex- Gunter Plant



23 Springs Granite Cedar Park
The Granite Cedar Maple Tower development is a high-profile, ground-up construction project in Uptown Dallas that spans a 2.56-acre urban site and includes a 27-story Class AA office tower, two standalone restaurant buildings, and a six-level underground parking garage. Cummings Electrical provided full electrical construction services for the entire development, totaling 1,272,984 square feet of above-grade and below-grade space. The scope included the 642,195 SF core and shell office tower, featuring premium office space, a finished lobby, restrooms, and amenity areas designed to attract top-tier tenants. Electrical infrastructure was designed and installed to support future tenant buildouts, Class AA amenity spaces, and high-end lighting and controls systems for public areas. The 614,334 SF below-grade parking garage, spread across six levels, accommodates approximately 1,581 vehicles.
Cummings’ scope included lighting systems, emergency power distribution, smoke evacuation wiring, and coordination of power for garage access and ventilation systems—all while navigating the constraints of a tight urban footprint. Two cold dark shell restaurant buildings were also included in the electrical package: a 5,977 SF single-story building and a 10,478 SF two-story building. These spaces were delivered with core electrical infrastructure to support future commercial kitchen, HVAC, and tenant finish-out requirements. Cummings also played a key role during pre-construction—evaluating power distribution strategies, coordinating below-grade utility pathways, and ensuring code compliance within the dense downtown environment. All systems were built for scalability, energy efficiency, and long-term maintainability.

Project Snapshot
View our complete project showcase.
Ready to learn more? Discover the latest insights in engineering, manufacturing, and design.

Scaling with Integrity: Ensuring Service Excellence Amidst Rapid Expansion

Why Seasonal Electrical Maintenance is Critical for Facility Reliability

Owner’s Guide: Preventative Maintenance to Avoid Costly Repairs

How Predictive Maintenance Technologies Prevent Electrical Failures