Little Pringle Wind Farm 20 MW - Collection System & Substation
Design-Build of a 20 mega-watt farm consisting of 10 turbines that included 2 Utility Interconnects, 2 34.5v Underground Collection Systems, Tower Foundations and Tower Wiring.
Specs. Exceeding Expectations.
Location: Stinnet, Texas
General Contractor: Balfour Beatty Construction
Value: $4.0 M
Duration: 2.9 Months