Minco III Wind Farm - Collection System and Substation/T-Line

New construction of a 345-34.5 kV Substation, 34.5 kV Underground Four (4) 34.5 kV underground feeder circuits will be terminated at the 34.5 kV box structure.

Specs. Exceeding Expectations.

Location: Minco, Texas

General Contractor: Blattner Energy

Value: $5.8 M

Duration: 10 Months