project-detail
Medium & High Voltage,Renewable Energy
Old Settler Cotton Plains Substation
New construction of a 200 MW substation for the Old Settler Cotton Plains Wind Farm, which utilizes 63 GE 2.4 MW Wind Turbine Generators (WTGs).
Specs. Exceeding Expectations.
Location: Floydada, Texas
General Contractor: FAGEN Inc.
Value: $5.0 M
Duration: 9 Months